Part 3. Commissioning Procedure
102 Design Guide DCM014A51
Part 3. Commissioning Procedure
1. Site Visit
1.1 Obtaining Object Information
Initializing the configure BACnet® Server Gateway CSV file is required before the test operation.
Gather the object information listed below ([1] - [6]) before visiting the site. Obtain this
information from the Daikin sales person or Sales Representative for the object. (Fill in the
information related to the object in the blank space of [1] - [6].)
1. Confirmation of communication method between the iTM and the BMS front end:
Communication method between the iTM and the BMS front end.
Communication method for the objects
2. BACnet® communication port number:
Note: The factory setting is 47808. The available setting range is 1 - 65535.
BACnet communication port number
3. Device ID (instance number) for each VRV indoor unit:
Note: The available setting range is 0 - 4194303 there is no factory setting assigned.