EasyManua.ls Logo

Daikin R410A - Page 19

Daikin R410A
44 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
17
TM-FVN-0515-A
Pipe retainer
Drain hose inside
the unit
Insulation for fitting
Fix using the cable tie
Knock-out hole
Rear panel
Cut holes here
Bottom panel
Figure G
<In case of rear piping>
1. Open the holes on the rear panel. (Refer to Figure G).
2. Pass refrigerant pipes, drain pipes, and unit wiring through the hole on the rear panel.
<In case of downward piping>
1. Cut holes in the indicated area of the bottom frame. (Refer to Figure G).
2. Pass refrigerant pipes, drain pipes, and unit wiring through the hole on the bottom frame.
After rigging pipes and wiring, lock down the refrigerant pipes, drain hose inside the unit,
indoor-out-door unit. Transmission wiring and grounding line, in the piping guide.

Other manuals for Daikin R410A

Related product manuals