Do you have a question about the Daikin RXYSQ6P8V1B and is the answer not in the manual?
Model | RXYSQ6P8V1B |
---|---|
Category | Air Conditioner |
Cooling Capacity | 16.0 kW |
Heating Capacity | 18.0 kW |
Refrigerant | R410A |
Power Supply | 3-phase, 380-415V, 50Hz |
Operating Temperature (Cooling) | -5 to 46°C |
Operating Temperature (Heating) | -20 to 15.5°C |
Describes the system layout and components for Sky Air or room air conditioner units.
Details compatible indoor units and capacity ranges for outdoor units.
Lists standard accessories included with the unit for installation.
Lists optional accessories required for specific installation configurations.
Refers to the Engineering Data Book for detailed technical specifications.
Emphasizes strict cautions for keeping the R410A system clean, dry, and tight.
Provides installation guidance for Sky Air/room air conditioner and VRV indoor units.
Instructions on how to safely handle the unit during installation.
Details methods to secure the unit and prevent it from falling over.
Instructions for removing the transportation stay before operation.
Procedures for correctly installing drain piping for proper drainage.
Details criteria for selecting appropriate piping material and thickness.
Provides essential cautions and procedures for brazing refrigerant piping.
Outlines important cautions for making secure flare connections.
Instructions to prevent foreign objects from entering the unit's electrical box.
Important cautions for handling the refrigerant stop valves.
Step-by-step guide on how to open and close the stop valves.
Cautions regarding the handling and tightening of the valve cover.
Important precautions when handling the service port.
Precautions for connecting piping and ensuring proper insulation.
Illustrates connection examples for Sky Air or room air conditioner units.
Illustrates connection examples for VRV indoor units.
Procedures for performing leak tests and vacuum drying on the system.
Guidance on how to add refrigerant to the system.
Important details about the refrigerant R410A and its environmental impact.
Instructions on changing field settings for BP unit applications.
Details various procedures for adding refrigerant to the system.
A table listing internal wiring components and their designations.
Essential precautions to follow during electrical wiring installation.
Examples showing total system wiring connections.
Guidance on connecting power and transmission wires.
Important precautions to observe before performing service operations.
A checklist of essential checks before the initial start-up of the unit.
Instructions for performing field settings on the unit.
Step-by-step guide for performing the test operation.
Procedures for checking the unit during normal operation.
How to confirm temperature adjustment operations.
Method for vacuuming the system, typically for repair purposes.
Procedure for recovering refrigerant using a dedicated reclaimer.
Introduction to refrigerant leak precautions and applicable standards.
Discusses maximum refrigerant concentration levels in occupied spaces.
Steps to check and comply with maximum concentration levels.