EasyManua.ls Logo

Daikin SkyAir FHQ24PVJU - Page 192

Daikin SkyAir FHQ24PVJU
238 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
EDUS281120_a Installation of indoor unit
RZR-P, RZQ-P(9) 191
3PN14093-12A
English 5
CAUTION
Install the indoor and outdoor units, power supply wiring and
connecting wires at least 3.3 ft away from televisions or radios
in order to prevent image interference or noise.
(Depending on the radio waves, a distance of 3.3 ft may not
be sufficient enough to eliminate the noise.)
In the case of the installation of a wireless remote controller, the
transmission distance of the wireless remote controller may be
shortened if the room has a fluorescent light of electronic light-
ing type (i.e., an inverter or rapid-start fluorescent light).
Keep the distance between the receiver and the fluorescent
light as far as possible.
(2) Use suspension bolts to install the indoor unit. Check that
the place of installation withstands the weight of the indoor
unit. Secure the suspension bolts with proper beams if nec-
essary.
4. PREPARATIONS BEFORE INSTALLATION
(1) Check the positional relationship between the ceiling open-
ing hole and the suspension bolt of the unit.
For the maintenance, inspection, and other servicing
purposes of the control box and drain pump, prepare one
of the following service spaces.
1. Inspection hatch 1 (17-3/4 × 17-3/4) for the control
box and a minimum space of 12 in. for the lower part
of the product. (Refer to Fig. 2-2)
2. Inspection hatch 1 (17-3/4 × 17-3/4) for the control
box and inspection hatch 2 for the lower part of the
product (see arrow view A-1). (Refer to Fig. 2-3)
3. Inspection hatch 3 for the lower part of the product
and the lower part of the control box (see arrow view
A-2). (Refer to Fig. 2-3)
(length: in.)
Ceiling
Floor surface
The H1 dimension indicates the
height of the product.
Determine the H2 dimension by
maintaining a downward slope of
at least 1/100 as specified in
“7. DRAIN PIPING WORK”.
Min. 1
Min. 12
Min. 18
Min. 99
Min. 28 (service space)
(If no ceiling board is provided.)
*H1=12
*H2=Min. 25
[Required installation place]
The dimensions indicate the
minimum required space of
installation.
Fig. 2-1
28
24-13/16
(Suspension bolt pitch)
Inspection hatch 1
(17-3/4×17-3/4)
Inspection hatch
Control box
Control box
Ceiling
B
C
(Suspension bolt pitch)
Bottom of unit
Air inlet
Air outlet
Suspension bolt (× 4)
*H3=Min. 12
Fig. 2-2
Case 1
(length: in.)
28 28
Inspection hatch
Inspection hatch 1
(17-3/4×17-3/4)
Inspection
hatch 2
Inspection hatch 3
(Same as the indoor
unit size +12 or more)
Control box
Control box
Control box
Inspection hatch
(Ceiling opening)
Ceiling
Arrow view A-1 Arow view A-2
Min. D=B+12
Min. 8B
*H3=Min. 3/4
Model B C D
40
40-7/8
52
56
56-5/8
68
18 • 24 • 30 type
36 • 42 type
(length: in.)
A
Fig. 2-3
Case 2, 3
(Same as the
indoor unit
size or more)
Determine the H3
dimension by maintaining a
downward slope of at least
1/100 as specified in
“7. DRAIN PIPING WORK”.

Other manuals for Daikin SkyAir FHQ24PVJU

Related product manuals