EasyManua.ls Logo

Daikin SkyAir FHQ24PVJU - Page 210

Daikin SkyAir FHQ24PVJU
238 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
EDUS281120_a Installation of outdoor unit
RZR-P, RZQ-P(9) 209
3P281953-2A
7 English
When only two outdoor units are installed side by (2)
side
A
H
L
20 or less
12 or more
40 or more
The dimensional relationship between H, L and A is as
shown in the table below.
LA
L H
0 < L 1/2H 40
1/2H < L H50
H < L Install the frame to achieve “L
H”.
NOTE
Close the area under the frame so that the outlet air does 1.
not bypass there.
Only two outdoor units can be installed side by side.2.
<Pattern 2>
When an obstruction on the air outlet side is lower than the
outdoor unit (There is no restriction in the height of obstruction
on the air inlet side.)
When the upward area is open
When one outdoor unit is installed individually(1)
4 or more
20 or more
H
L
L>H
When two or more outdoor units are installed side (2)
by side
L
60 or more
H
A
The dimensional relationship between H, L and A is as
shown in the table below.
LA
0 < L 1/2H 10
1/2H < L H12
When an obstruction is present also in the upward area
When one outdoor unit is installed individually(1)
L
40 or more
40 or more
20 or less
H
A
The dimensional relationship between H, L and A is as
shown in the table below.
LA
L H
0 < L 1/2H 4
1/2H < L H8
H < L Install the frame to achieve “L
H”.
NOTE
Close the area under the frame so that the outlet air does
not bypass there.
When only two outdoor units are installed side by (2)
side
60 or more
20 or less
H
L
A
40 or more
The dimensional relationship between H, L and A is as
shown in the table below.
LA
L H
0 < L 1/2H 10
1/2H < L H12
H < L Install the frame to achieve “L
H”.
NOTE
Close the area under the frame so that the outlet air does 1.
not bypass there.
Only two outdoor units can be installed side by side.2.

Other manuals for Daikin SkyAir FHQ24PVJU

Related product manuals