EasyManua.ls Logo

DANA Spicer Torque-Hub S350 Series User Manual

DANA Spicer Torque-Hub S350 Series
56 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
1
Torque-Hub
®
Planetary Final Drive
S350 Series Service Manual
Rev 04/11/13
Question and Answer IconNeed help?

Do you have a question about the DANA Spicer Torque-Hub S350 Series and is the answer not in the manual?

DANA Spicer Torque-Hub S350 Series Specifications

General IconGeneral
ModelS350 Series
ManufacturerDANA Spicer
CategoryDC Drives
TypeTorque-Hub
Cooling MethodNatural convection

Summary

Introduction

Testing and Lubrication Procedures

Roll Test

Procedure to check if the unit's gears rotate consistently and easily.

Leak Test

Procedure to ensure the unit is airtight by checking for air leaks.

Tightening and Torquing Bolts

Guidance on proper bolt tightening sequences and torque specifications.

Lubrication Information

Recommended lubricants and fill levels for optimal drive performance.

Disassembly Instructions

Main Disassembly

Step-by-step instructions for the primary disassembly of the unit.

Cover Disassembly

Procedure for removing and disassembling the unit's cover components.

Output Carrier Disassembly

Steps to disassemble the output carrier and its associated parts.

1st Stage Intermediate Carrier Disassembly

Procedure for disassembling the first stage intermediate carrier assembly.

2nd Stage Intermediate Carrier Disassembly

Procedure for disassembling the second stage intermediate carrier assembly.

Input Carrier Disassembly

Steps for the disassembly of the input carrier and its components.

Output Pinion Disassembly

Procedure to disassemble the output pinion assembly.

Assembly Instructions

Cover Subassembly

Instructions for assembling the unit's cover and related components.

Output Carrier Subassembly

Steps for assembling the output carrier and its parts.

1st Stage Intermediate Carrier Subassembly

Procedure for assembling the first stage intermediate carrier.

2nd Stage Intermediate Carrier Subassembly

Procedure for assembling the second stage intermediate carrier.

Input Carrier Subassembly

Instructions for assembling the input carrier and its components.

Output Pinion Subassembly

Procedure for assembling the output pinion assembly.

Main Assembly

Final assembly steps for the complete planetary final drive unit.

Supporting Documentation

Assembly Drawing

Visual representation of unit components and their arrangement.

Parts List

Comprehensive list of all parts used in the service manual.

Assembly Tools

Details and specifications for specialized tools required for assembly.

Contact Information

Related product manuals