EasyManua.ls Logo

Data Aire gForce Ultra - Rear Panel; Moving Unit into Final Location; Figure 2 Upper Hole for Spring-Loaded Hinge; Figure 3 Lower Fixed Pin Hinge

Default Icon
123 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
gForce Ultra IOM
17
Figure 2 Upper Hole for Spring-Loaded Hinge
Figure 3 Lower Fixed Pin Hinge
Rear Panel
Remove screws from rear panel to remove rear panel.
Moving Unit into Final Location
Move the unit in its upright position to the installation site using a forklift or pallet jack. It is recommended
that the unit be protected from damage to the decorative doors during any storage or moving.
The shipping skid should be left in place if the unit is being moved with a forklift. If the unit is being
lifted, use spreader bars to prevent damage to the doors and panels. The unit shipping skid as 3/4”
holes in the shipping skid to which casters with 3/4” (35 mm) stems can be attached. This allows easy
movement down halls, into elevators and through doorways. Improper lifting or moving of equipment
may result in damage to decorative doors, panels or frame members.
When rigging, make sure all wiring and tube connections are protected to prevent any damage.
Keep tines of the forklift level and at a height suitable to fit below the skid and/or unit to prevent exterior
and/or underside damage. Make sure the forks are spread to their widest allowable width for proper
balance. Do not lift the unit any higher than 4 inches (100 mm) off the ground. If necessary, to lift higher
than the suggested 4 inches (100 mm), exercise great care to ensure proper handling of the unit.
Personnel not involved with the lifting of the unit should keep a safe distance from the unit.

Table of Contents

Other manuals for Data Aire gForce Ultra

Related product manuals