Product Reference Guide
27
Power Installation
Plug your scanner into an electrical outlet that has been wired to meet all applicable electrical
codes, laws, and regulations and has a common ground with the Point-of-Sale terminal.
Grounding
The AC/DC Power Supply should have an AC outlet with a clean earth ground. If you are not
sure how to verify the amount of electrical noise (interference) on the power line, ask a qualified
electrician to measure the input line voltage.
Checkstand Preparation
Reference Figure 14. When performing a first time installation into a new checkstand, verify
before cutting that room will be allowed for cabling
and the AC/DC Power Supply. When
making the opening, take extra care to accurately cut to the correct dimensions. Mounting may
require installation of support(s), countertop routing, or other such devices. Depending upon
checkstand design, you may wish to install an item diverter to direct items toward the scan
window. See the instructions in this manual titled “Counter Cutout” for more details
concerning the location and preparation of the opening.
Figure 14. Installation Overview
Item
Diverter
Routed
Support
Lip
Counter Cutout
Support Rails
Cabling
(Models and
connections
vary)
AC/DC
Power
Supply
Liquid Spills and Moisture
Select a checkstand design which allows fluids to flow through, and directs liquids away from
any electronic equipment or storage areas.