EasyManua.ls Logo

De Nora MIOX AE Series - Mounting Panel and Cell Installation; Installing the Mounting Panel; Cell Installation

De Nora MIOX AE Series
55 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
MIOX AE Series Operators Manual
102-00085-E Page 12
Control Panel and Cell Installation
This section provides information and instructions for installing the AE System mounting plate and
electrolytic cell.
Note: these installation instructions do not apply for units that are pre-mounted on a stand.
Mounting Strut
There are three choices for mounting the strut to a wall, depending on the construction of the wall:
1) Wood screws to mount to a stud wall
2) Toggle bolts for a hollow wall such as cinder block or paneling
3) Expansion anchors for concrete
The strut should be mounted to the wall by drilling suitable holes through them. The vertical distances
from the upper to lower strut and the horizontal distances between holes are shown in Figure 2. The
wall material should be of sufficient strength to hold the control panel, which weighs up to 50 pounds
(22.68 kgs).
Figure 2 Strut Bolt Pattern

Table of Contents

Related product manuals