Table 2. DD6900 system with ES40 racking locations
Component Configuration Rack location
Controller location with ES40
shelves
Single node or high-availability (HA) primary node U13-U14
HA standby node U16-U17
FS25 location with ES40 shelves HA U31-U32
ES40 locations Single node or HA U01-U12, U19-30
Table 3. DD6900 system with DS60 racking locations
Component Configuration Rack location
Controller location with DS60
shelves
Single node or HA primary node U12-U13
HA standby node U15-U16
FS25 location with DS60 shelves HA U18-U19
DS60 locations Single node or HA U02-U11
Identifying the rail kit components
The 2U sliding rail assemblies allow the server to be secured in the cabinet, and extended from the cabinet so that the system
cover can be removed to access the internal FRUs.
Figure 6. Sliding rail assembly - 2U systems
1. Sliding rail (2)
2. Velcro strap (2)
3. Screw (4)
4. Washer (4)
The rails are compatible with racks with square holes, unthreaded round holes, and threaded round holes.
The rail kit also includes a unique cable management arm (CMA) bracket assembly that consists of inner and outer brackets, and
screws to attach the brackets to the rails.
Install the System in the Rack
17