Figure 59. Installing the M5 Screw
5
. Working from the front of the cabinet, align the adapter with the mounting hole on the front of the rack as shown in the
following figure.
Figure 60. Securing rail to front channel
CAUTION: To ensure proper alignment of the rails, check that:
● The holes on the rail line up with the holes on the cabinet.
● The rails are level from front-to-back and left-to-right.
● You use the same unit markers from the front of the cabinet to the rear of the cabinet.
6. P
ush in on the spring clip while pulling the rail forward. When the spring clip is forward of the front rack channel, and the
adapter is in the mounting holes, release the spring clip so it holds the rail in place.
CAUTION:
Ensure the spring clip is securely attached to the channel. It may be necessary to push in on the
clip to assist in snapping it into place.
Installing the shelf on the rails
About this task
CAUTION: The system components are heavy. To avoid personal injury and/or damage to the equipment, do not
attempt to install or remove system components without a mechanical lift and/or help from another person.
Install the Disk Shelves in the Rack 51