The Z9000 is suitable for installation as part of a Common Bond Network (CBN). It can be installed in:
network telecommunication facilities
data centers
other locations where the National Electric Code (NEC) applies
This chapter contains the following sections:
Site Selection
Cabinet Placement
Rack Mounting
Grounding
Fans and Airflow
Power
Storing Components
For more information about Z9000 specifications, refer to
Specifications
.
NOTE: Install the Z9000 chassis into a rack or cabinet before installing any optional components.
Site Selection
Dell Force10 equipment is intended for installation in restricted access areas. A restricted access area is
one in which access can only be gained by service personnel through the use of a special tool, lock, key,
or other means of security and access is controlled by the authority responsible for the location.
Ensure that the area where you install your Z9000 meets the following safety requirements:
Near an adequate power source. Connect the system to the appropriate branch circuit protection as
defined by your local electrical codes.
Environmental temperature between 32° to 104°F (0° to 40°C).
Relative humidity that does not exceed 85% non-condensing.
In a dry, clean, well-ventilated and temperature-controlled room, away from heat sources such as hot air
vents or direct sunlight.
Away from sources of severe electromagnetic noise.
Positioned in a rack or cabinet, or on a desktop with adequate space in the front, rear, and sides of the
Z9000 for proper ventilation and access.