Figure 13. Switch rail attachment
2 After you install both rails, line them up on the ReadyRails. Slide the switch in until it is ush with front of rack.
About three inches before you fully insert your system, the rail locking feature engages to keep the switch from inadvertently sliding
out and falling.
Figure 14. Front rack installation
NOTE
: Do not the use the mounted ReadyRails as a shelf or a workplace.
24 Z9100–ON installation