Forklift Installation
CAUTION!
TO MOVE THE PCS100, USE A FORKLIFT THAT HAS AN APPROPRIATELY RATED LIFT CAPACITY AND A
915 CM (36-INCH) FORK SPAN.
CAUTION!
THE ENCLOSURE MUST BE LIFTED FROM THE BOTTOM. THE ENCLOSURE MUST BE SUPPORTED ON
ALL FOUR SIDES WHEN LIFTING. PRECAUTIONS MUST BE TAKEN TO AVOID TIPPING OF THE
ENCLOSURE FRONT TO BACK AND SIDE TO SIDE DURING LIFTING BECAUSE THE CENTER OF GRAVITY
OF THE ENCLOSURE IS NOT THE CENTER OF THE ENCLOSURE.
1.
Unpack the PCS100, see “Unpacking the Unit” on page 12.
2.
Using the forklift to move the PCS100.
Removing the PCS100 from left/right side:
a.
Remove the hexagonal nuts and washers securing cabinet to the pallet.
Figure 24. Releasing a PCS from a Pallet
b.
Remove the screws securing the side base covers.
c.
Remove the base covers. Place them in a clean work surface for later use. The covers must
be replaced after cabinet installation and cable routing is completed.
!
!