EasyManua.ls Logo

Denon DR-F7 - Mechanism Section Adjustments

Denon DR-F7
65 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
ADJUSTING
AND
CHECKING
ΤΗΕ
MECHANISM
SECTION
1.
Replacing
the
Pinch
Roller
31
Before
replacing
the
pinch
roller,
clean
the
tape
contact
surface
of
the
pinch
roller
and
the
capstan
shaft
30.
Most
causes
of
poor
tape
transport
can
be
traced
to
dirty
pinch
rollers
and
capstan
shafts.
By
removing
the
pinch
roller
spring
33
and
the
2.5E
ring
139
,
the
pinch
roller
31
can
be
taken
out,
along
with
the
pressure bracket.
When
assembling,
always
insert
the
pressure
bracket
32
shaft
into
the
long
hole
of
the
con-
necting
lever
11
on
the
back
side
of
the
mechanism
chassis
1.
After
replacing,
run
a
pad-less
C-90
tape
to
check
for
tape
curls
at
the
tape
guide
section
of
the
head.
2.
Checking
the
Pressure
Force
of
the
Pinch
Roller
In
the
playback
mode,
hook
a
dial
tension
meter
(500
g)
onto
the
bracket
at
the
center
of
the
pinch
roller.
After
separating
the
pinch
roller
from
the
capstan
shaft,
allow
the
pinch
roller
to
contact
the
capstan
shaft
again.
Check
to
make
sure
the
dial
tension
meter
reads
between
375-
475
g
when
the
pinch
roller
starts
to
rotate.
If
it
is
not
within
the
normal
range,
replace
the
pinch
roller
spring.
Note:
In
the
playback
mode,
check
to
make
sure
that
there
is
a
gap
of
more
than
0.5
mm
between
the
pinch
roller
bracket
31
and
the
pressure
bracket
32.
0.5mm
|
pressure
bracket
|
pinch
roller
bracket
3.
Replacing
the
Record/Playback
Head
*
Before
replacing,
remove
the
mechanism
unit
from
the
chassis.
(1)
How
to
remove
the
Β/Ρ
HEAD.
1)
When
the
R/P
HEAD
holding
screw
102
is
taken
out,
be
careful
as
the
CORD
CLAMPERS
49
and
47
as
well
as
the
3T-LUG
with
the
wire
will
come
off.
Next,
take
out
the
azimuth
adjustment
NUT
159
and
the
height
adjustment
ORDER
SCREW
39
loosening
them
alternately.
If
they
are
not
lodsened
alternately,
the
R/P
HEAD
base
may
become
warped.
D
order
Screw
(85)
ΒΡ
Head
N
^
ES
Dan
v
(E
M2
x
6
crs
2)
By
unsoldering
the
HEAD
WIRES
on
the
circuit
board
section
of
the
R/P
HEAD,
the
entire
R/P
HEAD
can
be
taken
off
the
mechanism
unit.
(2)
How
to
assemble
the
R/P
HEAD.
Reverse
the
above
(1)
procedures
for
removing
the
R/P
HEAD.
*
Solder
the
HEAD
WIRES
according
to
the
diagram
above.
*
In
replacing
the
R/P
HEAD,
whenever
possible,
do
not
remove
the
WIRE
CLAMPER,
which
holds
the
HEAD
WIRES
to
the
CORD
CLAMPER
77.
It
is
adjusted
so
that
the
HEAD
WIRES
do
not
become
a
load
during
the
HEAD
PLATE
operations.
If
the
WIRE
CLAMPER
must
be
removed,
after
replac-
ing
the
R/P
HEAD,
check
to
make
sure
that
(1)
the
HEAD
WIRES
do
not
contact
the
pinch
roller
spring
during
the
HEAD
PLATE
operations;
(2)
the
HEAD
WIRES
are
not
creating
a
load
at
the
bottom
plate
and
that
the
HEAD
PLATE
lowers
to
the
required
position
at
the
STOP
mode.
4.
Adjusting
the
R/P
HEAD
(1)
Height
adjustments
(Use
the
head
adjusting
jig
M-300)
Set the
M-300
tool
plate
on
the
mechanism
unit;
turn
the
height
adjustment
ORDER
SCREW
39
and
adjust
so
that
the 3.8
mm
measure
section
of
the
M-300
(tool
grip)
can
pass
without
contacting
the
tape
guide
of
the
R/P
HEAD
35.
43ج

Related product manuals