EasyManua.ls Logo

Desa AC 140 E - Page 41

Default Icon
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
8
OPERATION - Introduction
Before starting operations in this section:
1) Find a place where there is power supply nearby.
2) As shown below, install the exhaust hose, and adjust the window position well.
3) Insert the power cord into an grounded
AC220~240V/50Hz socket;
4) Press the ON/OFF button to turn on the air-
conditioner.
1. Before using
Notice:
- Operation temperature range:
DB - temperature of dry
themometer
WB - temperature of wet
thermometer
Check up whether the exhaust hose has been mounted properly.
Cautions for cooling and dehumidifying operations:
- When using functions on cooling and dehumidifying, keep an interval of at least 3
minutes between each ON/OFF.
30 c
m

Related product manuals