Do you have a question about the DG Flugzeugbau LS4-b and is the answer not in the manual?
Brand | DG Flugzeugbau |
---|---|
Model | LS4-b |
Category | Planer |
Language | English |
Guidelines for repairing airframe parts and requirements for major repairs.
Specifies the maximum operating time and inspection intervals for the airframe.
Defines lifespan limitations for safety harness and other components.
Outlines requirements for manufacturer's documentation for equipment.
Step-by-step guide for weighing the sailplane and determining CG.
Provides examples for calculating loading limits and cockpit load.
Tables showing CG ranges based on empty mass for different cockpit loads.
Defines maximum non-lifting parts mass, considering water ballast and TNs.
Outlines regular inspection procedures, including daily and annual checks.
Specifies components requiring extraordinary inspection after rough landings.
Details the procedure for extending the glider's service time through inspections.
Instructions for removing and installing wing, elevator, and rudder control surfaces.
Guides on removing and installing wing water ballast bags.
Details the removal of the tail fin water ballast tank.
Explains the removal and installation process for the C.G. hook.
Provides instructions for removing and installing the optional nose hook.
Details the procedure for checking and operating the canopy emergency release.
Details the weight and mass balance requirements for control surfaces.
Details the installation of fixed ballast under the instrument panel for CG adjustment.
Explains the installation of rear ballast for CG adjustment.
Provides general guidelines and definitions for minor damage in composite structures.
Basic principles for FRP repairs, including material use and postcuring.