EasyManua.ls Logo

Direct Bikes DB125T-9 - Top Box Installation

Default Icon
31 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
7
Top box
The top box is supplied with a universal tting kit. Place the top box
centrally on the rack. Hold the long slotted bars under the rack with the edges
of the bars facing upwards. Put the long screw and washer through the holes
in the box and then through the slide underneath the rack. Fix in place and
tighten with the nuts and washers provided. Cover the screws with the mat provided.
A maximum weight of 10 kilos is recommended. The weight may also alter the
handling of the scooter.