EasyManua.ls Logo

Direct-Lift PP9 Plus - Page 7

Default Icon
36 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
7
4HENTHEENTIREENDSTRUCTURETWOCOLUMNSANDCROSSBEAMWILLNEEDTOBESTOODUPASONE
 5NPACKTHE,OCK,ADDERS)TEM&IGUREFROMTHEPACKAGEANDSLIDETHEMINTOTHEPRECUTSLOTON
THE2UB"LOCKS)TEM&IGUREINSIDEEACHCOLUMN!FTERREMOVINGTHETOPNUTFROMTHELOCK
LADDERYOUAREREADYTOINSTALLTHE4OP#APS!")TEMS&IGURESONTHECOLUMNS
 "EAWAREOFTHEOFFSETHOLEINCOLUMN4OP#APS!RRANGETHEMSOTHATTHECABLEMOUNTINGHOLESARECLOS
ESTTOTHERUNWAYS5SEPROVIDEDBOLTSNUTSWASHERSANDLOCKWASHERSTOINSTALL4OP#APSASSHOWNIN
&IGURE
 3ECURE4OP#APAND,OCK,ADDERASSEMBLIESTOGETHERWITH7ASHERAND.UT)TEMS&IGURE
Position the Crossbeams at the second lowest locking position on all columns.
 3TANDUPANDARRANGETHETWOENDSTRUCTURES#OLUMNS#ROSSBEAMSSOTHATTHEOUTSIDEOFTHE#ROSS
beam rail to the outside of the other Crossbeam rail measure's 184.5”. Compare the measurements from
THELEFTANDTHERIGHTUNTILTHEYAREDIAGONALLYWITHINv4HEvVARIANCEWILLHELPINMOUNTING
the runways later.
 ,IFTANDPOSITIONEACH2UNWAYINTOPLACEANDSECUREWITHTHEPROVIDED(EX"OLTS,OCK7ASHER&LAT
7ASHERAND.UT)TEMSASSHOWNIN
&IGURE4HELIFTWILLSQUAREITSELFASYOUFURTHERASSEMBLEIT
.OTE)NSTALLTHE/FFSIDE2UNWAY)TEMOPPOSITEFROMTHE-AINSIDE2UNWAY)TEMAND0OWERUNIT
#OLUMNASSHOWNIN&IGURE
 "EGINCABLEROUTINGINSTALLATIONBYREMOVINGTHE#ABLE3HEAVES3HAFTSAND3PACERSFROMALLFOURCORNERS
OFTHE-AINSIDE2UNWAYASSHOWNIN&IGURE
 2OUTEANDMOUNTTHEAPPROPRIATE#ABLES)TEMSTOEACH#OLUMN4OP#APWHILEENSUR
INGTHATTHE0LASTIC#ABLE0ULLEY)TEMISBETWEENTHE#ABLEANDTHE,OCK,ADDERASSHOWNIN
&IGURES4HISWILLALLOWTHESECONDARYSLACKCABLELOCKTOFUNCTIONPROPERLY3EE&IGURE
for Cable routing installation.
14. Reinstall the Cable Sheaves, Shafts, Spacers and hardware as shown in
&IGURES
.OTE-AKESUREALL#ABLESAREPROPERLYROUTEDAROUND#ABLE3HEAVES
 )NSTALLALL,OCK2ODS,INKAGECOMPONENTSPERTHEDRAWINGON0AGE&IGURE!LSOINSTALLTHE
#ROSSBEAM"RACKET)TEMTOMIDDLEOUTSIDEOFEACH#ROSSBEAM3ECUREWITHTHEPROVIDED(ARD
WARE)TEMS&IGURE
 -OUNTTHE0OWER5NIT)TEMTOTHE-AINSIDE#OLUMNWITHTHEATTACHEDMOUNTINGBRACKETUSINGTHE
(ARDWARE)TEMSPROVIDEDASSHOWNIN&IGURE/NCEMOUNTEDlLLTHE0OWER
5NITRESERVOIRTANKWITHHYDRAULICmUID.OWINSTALLTHEDEGREE(YDRAULIC&ITTING)TEM&IGURE
TOTHEHIGHPRESSUREPORTONTHE0OWER5NIT#ONNECTTHEELECTRICALPOWERTOTHE0OWER5NIT
 )NSTALLTHEhBRADEDv(YDRAULIC(OSE)TEMTOTHE&ITTINGONTHESIDEOFTHE-AINSIDE2UNWAYANDAT
TACHTHEOTHERENDTOTHEDEGREE&ITTINGONTHE0OWER5NITASSHOWNIN&IGURE
 .OWRAISETHECOMPLETEUNIT,IFTANDSETATONEOFTHEBOTTOMLOCKPOSITIONS0LACELEVELONCROSSBEAM
 4IGHTEN,OCK,ADDER2OD.UTLOCATEDONTHETOPOFEACHPOSTS)TEM4HISWILLRAISETHECORNEROFTHE