FX30 - OPERATION 69
POTHOLE
FX30 - OPERATION 69
POTHOLE
12. Position tool over area to be excavated and begin pothole.
Electric shock. Contacting electric
lines will cause death or serious injury. Know
location of lines and stay away.
NOTICE: Do not direct water lance at overhead lines. Water
conducts electricity.
If using 2-in-1 potholing tool:
• Squeeze water pressure lever to start water pressure.
• Work pressurized water in a rocking or circular motion to
loosen and excavate soil until hole is at the desired
diameter and depth.
If using basic potholing tool:
• First use water lance to loosen soil.
• Work pressurized water in a rocking or circular motion to
excavate soil.
• Use water lance and tool alternately until hole is at the
desired diameter and depth.
13. Adjust water pressure as needed to match soil conditions
and/or material of utility being exposed.
12. Position tool over area to be excavated and begin pothole.
Electric shock. Contacting electric
lines will cause death or serious injury. Know
location of lines and stay away.
NOTICE: Do not direct water lance at overhead lines. Water
conducts electricity.
If using 2-in-1 potholing tool:
• Squeeze water pressure lever to start water pressure.
• Work pressurized water in a rocking or circular motion to
loosen and excavate soil until hole is at the desired
diameter and depth.
If using basic potholing tool:
• First use water lance to loosen soil.
• Work pressurized water in a rocking or circular motion to
excavate soil.
• Use water lance and tool alternately until hole is at the
desired diameter and depth.
13. Adjust water pressure as needed to match soil conditions
and/or material of utility being exposed.