Systems and Equipment - 170 JT100/JT100 All Terrain Operator’s Manual
Hydratong Wrenches
Scribe Line Method
1. To join, scribe straight line across joint on both
sides of separating line (A).
2. To join, scribe second line (B) on moveable side of
joint in the opposite direction of tightening action.
Refer to table for correct dimension.
Connection Dimension
transition sub to JT100 pipe 3/8” (9.5 mm)
transition sub to beacon
housing
3/8” (9.5 mm)
transition sub to JT100 All
Terrain pipe
7/16” (11 mm)
transition sub to
backreamer
3/8” (9.5 mm)