Do you have a question about the Doka Xclimb 60 and is the answer not in the manual?
Brand | Doka |
---|---|
Model | Xclimb 60 |
Category | Protection Device |
Language | English |
Crucial safety guidelines for users, covering target groups, hazard assessment, planning, and industrial safety regulations.
Explanation of how Eurocodes are used in Doka's product design and the shift from permissible stress design.
Overview of Doka's comprehensive services offered at each project stage, from development to close-out.
Detailed illustration and list of all components that make up the Automatic climbing formwork Xclimb 60 system.
Explanation of the hydraulic repositioning process and the lifting by crane mechanism for the formwork system.
Details on component sizes and configurations for start-up and typical zones of the formwork system.
Provides information on imposed loads and service loads, including permitted live loads per vertical profile.
Guidance on determining wind pressure and its influence width on vertical profiles for structural design.
Describes the components and methods for establishing secure positioning and suspension points on the structure.
Details on different types of stop anchors (17.5cm 55, 11.5cm 90) and their specifications for anchoring.
Step-by-step instructions for closing the formwork elements, securing them, and adjusting pressure wedges.
Procedure for opening the formwork, releasing fixings, detaching wedges, and rolling back travelling units.
Guidance on adjusting formwork elements vertically and horizontally using spindles and wedges.
Overview of the initial steps and considerations for setting up the modular Xclimb 60 system on-site.
Instructions for pouring the first concrete section, including formwork setup, reinforcement, and stripping.
Detailed steps for mounting the formwork system to the structure and fixing the working platform.
Procedures for subsequent casting sections, including preparing guiding shoes and mounting platforms.
Comprehensive instructions for safely resetting the entire unit using the hydraulic system.
Guidelines for safely lifting the entire formwork unit by crane, including hoisting points and safety precautions.
Detailed steps for assembling the working platform, including mounting decking supports and travelling gear.
Instructions for setting the adjusting spindle and mounting the scaffold-tube bracing for the travelling unit.
Procedure for safely dismantling and lifting formwork elements or panels off the climbing unit.
Steps for removing the entire scaffold unit from the structure by crane, including guide cheek manipulation.
Description of the double-acting hydraulic system, including units, cylinders, and connection diagrams.
Methods for closing gaps in decking and platforms using rubber sheets or flaps to prevent falling items.