Do you have a question about the Doughboy CENTURY and is the answer not in the manual?
Read instructions completely before installation. Ignore other English instructions.
Notes on professional installation responsibility and Embassy PoolCo's right to modify designs.
Advice on installing pool walls on windy days, handling parts, and lifting heavy boxes.
Covers leveling, soil, safety signs, securing the pool, liner care, and electrical safety.
Prohibits diving boards/slides and specifies minimum temperature for liner installation.
Guidelines for choosing a pool location, considering fences, trees, sun, utilities, and ensuring a level ground.
Recommends assistance, avoiding wind, maintaining walking space, and considering groundwater levels.
Lists necessary materials like nails, blocks, string, clips, boards, tape, stakes, and sub-liner for pool assembly.
Lists essential tools including levels, saws, pens, knives, screwdrivers, hammers, shovels, and tape measures.
Mark pool diameter, level and smooth soil, remove debris, and use sand for a solid subsoil.
Use a stake to draw a circle, assemble bottom rails into connecting pieces, ensuring they are flush.
Uncoil pool wall, insert into bottom rail groove, adjust ends, and secure with nuts and bolts.
Position studs at the top front and secure connections using self-tapping screws for easier installation.
Assemble end caps by carefully following diagrams and attach cover panels according to specific hole patterns.
Assemble guard panels alongside the pool edge, hooking them from the outside and clicking them inside.
Prepare a slanting sand elevation, check soil for projections, and place the water-resistant sub-liner.
Fold out the liner, ensuring the internal lining hangs outside the upper edge and the center is positioned correctly.
Use binder clips to tension the liner, ensuring the bottom is smooth and creases are managed during initial filling.
Fill the pool to approx. 50 cm below the cover panel, ensuring the liner does not fall back into the pool.
Loosen liner from segments to allow adjustment, ensuring it remains taut and correctly positioned during filling.
Fold overhanging liner outwards, pull tight, and install plastic profiles and stabilizer rails.
Assemble the skimmer, inlet, and filter as per specific instructions and continue filling the pool.
Locate the pool in the most elevated part of the garden, ensuring the water level is above groundwater.
Determine excavation size, depth, and ensure a base of at least 15 cm sand or styrodur.
Install skimmer and inlet before filling with water or sand, connecting them with rigid PVC to the filter.
Fill pool to 5 cm from the top edge to absorb pressure from stabilized sand application.
Shows specific installation layout with space between pool top, stabilizer sand, and grade.
Mix fluvial sand with concrete; apply carefully, monitoring the pool wall for collapse during filling.
Explains skimmer function for maintaining pool cleanliness and the need for regular basket cleaning.
Step-by-step guide for installing the skimmer valve, top gasket, bottom gasket, and skimmer plate.
Screw remaining self-tapping screws through the skimmer plate, liner, and wall, then cut away excess liner.
Install inlet gasket, fixture, and eyeball piece, ensuring correct orientation for water flow.
Steps for connecting and using a vacuum hose with the pump, including air removal and cleaning.
Instructions for using the vacuum cover and safety warnings regarding pump operation.
A detailed list of all parts included in the standard skimmer assembly with article numbers and descriptions.
Lower water level, check screws/connections, inspect liner for leaks, and remove accessories.
Disconnect and clean filter; use anti-freeze liquid according to dosage and safety instructions.
| Brand | Doughboy |
|---|---|
| Model | CENTURY |
| Category | Swimming Pool |
| Language | English |