J1 SEISMIC BRACKETS
CONSTRAINT BRACKET INSTALLATION
11/05
The case constraint brackets can be installed
in 2 ways. Option 1 can be used on multi-deck cases
and uses an “L bracket to attach the case to a vertical
wall, as shown below. Option 2 can be used on multi-
deck cases or on cases that do not have a canopy.
Attach the “L brackets to the base frames in either of
the locations shown below. Brackets are available for
all base frame heights.
CONSTRAINT BRACKET
ATTACH TO TOP OF CASE
USE (3) #10 SELF TAPPING
SCREWS
ATTACK BRACKET TO WALL
USE (1) 0.5"
OR (2) 0.375" ANCHORS
BASE FRAME CONSTRAINT BRACKET - 2 PER CASE
(BRACKET SHOWN HERE IS FOR A 5" TALL BASE FRAME,
CONSTRAINT BRACKETS ARE ALSO AVAILABLE
FOR ALL BASE FRAME HEIGHTS
USE (3) #10 SELF DRILLING / SELF TAPPING SCREWS
FOR ATTACHMENT TO THE BASE FRAME
ALTERNATE LOCATION
(BACK OF CASE)
USE (1) 0.5" OR (2) 0.375"
ANCHOR(S) FOR ATTACHMENT
TO THE STORE FLOOR
OPTION 1
OPTION 2
BRACKET CAN BE POSITIONED
ON EITHER SIDE OF THE
BASE FRAME