EasyManua.ls Logo

Dover Markem-Imaje LASER 7031 - Page 107

Dover Markem-Imaje LASER 7031
192 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Pre-Installation Installation Training
A70622-D1
107/192
Step 5 : Marking of the opennings - Installation on to the conveyor using the mounting
brackets. Mark a suitable opening on the required side for:
1- Position the marking head. It must take into account the focal distance of the
lens which equips the LASER head.
2- Entry of the accessories (photocells, extractor nozzle, air dryer,…)
3 - Product travel through the tunnel (mark the position on the input/ outputs
plates (without mounting the plates)
Cut the openings on the marked-out sections of the plates.
Step 6 : Place the tunnel input and output plates. They are cutted according conveyor
configuration and add the seals

Related product manuals