13.2.1 ACR/RIM Hardware Installation
Installing ACR/RIM Interface:
1. Attach the enclosure to a wall with fasteners (not-supplied)
within 5 feet (1.5 m) of the SiteSentinel® iSite™ controller.
Enclosure needs to be in a non-hazardous location.
Figure 13-2 ACR/RIM Interface Mounting
Enclosure
2. Install the following 1/2-inch or 3/4-inch steel conduits and
wires:
Direct Pump Control (DPC) power source conduit and pull
three 14-AWG wires from the breaker panel.
ACR/RIM must be powered from a dedicated single circuit
breaker. Do not use a switch neutral breaker. The neutral
must come directly from the neutral bus in the electrical
supply panel. No other neutral circuits may be connected to
this wire.
Pump Communication Conduit and pull two (2) wires from
pump distribution box.
3. Mount the ACR/RIM board on the left-side stand-offs in the
enclosure.
Figure 13-3 ACR/RIM Power/Pump Conduit
Remove connector from CN12 ACR/RIM board and attach
output wiring from the power supply to the connector
(Polarity is NOT essential).
Reconnect connector to CN12 on the ACR/RIM board.
4. Attach line, neutral, and ground wires from the breaker panel
to the power connection block. ().
Figure 13-4 ACR/RIM Wiring