WARNING!
Inspect for Leaks
All couplings, inlet and outlet valves must be inspected for leaks
after pressurizing the system. Additional inspection is required
on the hanging hardware after all work on the LPG system.
Components in the Helix LPG hydraulic cabinet are shown in Fig 16.1 and Fig 16.2.
Side A
Safety
valve
Meter
Differential
valve
Pressure
Relief valve
Safety
valve
Manual
Ball valve
Filter
Degassing
Unit
Solenoid
valve
Coil and
WIP
Return
valve
Figure 16.1: Components in the hydraulics cabinet side A (side B at Helix 6000 B2B LPG)
WM048523 Rev 08 01/2019 271
16 Helix LPG - IEC