EasyManua.ls Logo

Dover Wayne Helix WM048523 - Page 325

Dover Wayne Helix WM048523
366 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
2
Cut and remove the seal wires on both calibration doors on the WIP.
3
Remove the WIP from the meter and move WIP aside. The WIP cable does not need to be
disconnected.
A
Dome
WIP
Cylinder
Cover
4
Remove the (8) 5 mm hex socket head screws that secure the meter dome to the meter. (B)
Note: There is no need to remove the proportional valve. Photos below are shown without
valve for clarity.
B
Screws (8)
WM048523 Rev 08 01/2019 321
18 iMeter2 Components Replacement Procedures

Table of Contents

Related product manuals