Doyle Sailmakers Inc.
1.800.94.DOYLE
info@doylesails.com
6
following:
R Sharp knife
R One roll of vinyl rigging tape
R Bosun's chair
R Screwdriver with 5/16" slot head
R An electric drill, cordless power drill preferred
R Felt tip marker
The steps for installing the StackPack should be taken in proper sequence to insure correct
and, hopefully, carefree installation. Please read through the whole procedure first to
familiarize yourself with the overall picture:
(Fig. 1 & lb).
R Install upper pad eyes on mast. (Fig. 2a)
R Install lower pad eyes on mast. (Fig. 2b)
R Install mainsail battens and cover battens. (Fig. 3a,b,c)
R Install (bend) mainsail on to mast and boom. (Fig. 4a)
R Rig lazy jacks. (Fig. 5)
R Lead forward cover lines to lower pad eyes. (Fig. 2b)
After completing the above steps, be sure to make a dry run, at the dock or on the
mooring. Lower and stack the sail, and close and zip the StackPack to insure everything is
in proper working order. During this practice session, make any final adjustments and
familiarize yourself with the forward cover.