18 e Big Lebowski™ Pinball Quick Setup Guide
Step 28
upright position to the backbox.
Next, remove the packing
material from the Bowling Alley
and drop one ball onto the
The ball will roll down the
mechanism.
Step 29
Install the plumb bob in the
tilt mechanism:
The higher the plumb bob is
mounted, the more sensitive it is.
Remove packing material
e tilt mechanism
Drop one ball in the Bowling Alley