4 ReplacementProcedures 4.144 LED board and IO
board
Satellite Pro L50-G / dynabookP*-C* MaintenanceManual 4-34
Installing LED board and IO board
Install LED board andIO board according to the following proceduresandFigure 4-16.
1. PlaceIO board in correct position.
2. Securing IO board with oneM2.0x4.0 black Phillips headscrews.(▲ mark portions)
3. Connect LED board cable to CN100 on LED board.
4. PlaceLED board in correct position.
5. SecuringLED board with two M2.0x2.5 black Phillips headscrews.