EasyManua.ls Logo

Earth Brick - Solid Paving Installation

Earth Brick
16 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Installation in solid pavings
Reserve the space in the
ground in which BRICK Solar
lamp will be installed
at least: 100x200mm
Depth:6cm
Drainage tube (Not provided)
1
Connect the lamp and the
drainage base by screwing
together. ( screws are included
in the packaging ).
2