EasyManua.ls Logo

Eastron SDM630-Modbus MID V2 - Demand Integration Time

Eastron SDM630-Modbus MID V2
45 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
9
B+G e-tech GmbH Fr.-Mehring St. 36 DE 01979 Lauchhammer
Fax: 0049 3574 4675519 Web: www.eastron-germany.de
2-4
After setting the last digit, SET will show.
Press to exit the number setting routine and return to the Set-up menu. SET will be
removed
DIT Demand Integration Time
This sets the period in minutes over which the current and power readings are integrated for
maximum demand measurement. The options are: 0, 5, 8, 10, 15, 20, 30, 60 minutes
1
From the set-up menu, use and
buttons to select the DIT option.
The screen will show the currently
selected integration time.
2-1
Press to enter the selection
routine.
The current time interval will flash
2-2
Use and buttons to
select the time required.

Related product manuals