EasyManua.ls Logo

Eastron SDM630MCT V2 - DIT Demand Integration Time

Eastron SDM630MCT V2
29 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
B+G e-tech and EASTRON SDM630MCT V2 User Manual
B+G e-tech GmbH www.stromzähler.eu info@bg-etech.de
- 10 -
DIT Demand Integration Time
This sets the period in minutes over which the current and power readings are integrated for
maximum demand measurement. The options are: off, 5, 8, 10, 15,20, 30, 60 minutes
1
From the set-up menu, use and
buttons to select the DIT
option. The screen will show the
currently selected integration time.
2-1
Press to enter the selection
routine. The current time interval will
flash
2-2
Use and buttons to
select the time required.
2-3
Press to confirm the selection.
SET indicator will appear.
Press to exit the DIT selection routine and return to the menu.

Related product manuals