B+G e-tech and EASTRON SDM630MCT V2 User Manual
B+G e-tech GmbH www.stromzähler.eu info@bg-etech.de
DIT Demand Integration Time
This sets the period in minutes over which the current and power readings are integrated for
maximum demand measurement. The options are: off, 5, 8, 10, 15,20, 30, 60 minutes
From the set-up menu, use and
buttons to select the DIT
option. The screen will show the
currently selected integration time.
Press to enter the selection
routine. The current time interval will
flash
Use and buttons to
select the time required.
Press to confirm the selection.
SET indicator will appear.
Press to exit the DIT selection routine and return to the menu.