EasyManua.ls Logo

Eaton 5125 - Chapter 3 Installation; Equipment Inspection and Preparation; UPS Internal Battery and General Installation; UPS Rear Panel Identification

Eaton 5125
68 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Eaton 5125 Tower UPS (1000–2200 VA) User's Guide S 05147304 Rev C www.eaton.com/powerquality
19
Chapter 3 Installation
This section explains:
S Equipment inspection
S UPS internal battery connection
S UPS installation
S UPS rear panels
Inspecting the Equipment
If any equipment has been damaged during shipment, keep the shipping
cartons and packing materials for the carrier or place of purchase and file
a claim for shipping damage. If you discover damage after acceptance,
file a claim for concealed damage.
To file a claim for shipping damage or concealed damage: 1) File with
the carrier within 15 days of receipt of the equipment; 2) Send a copy of
the damage claim within 15 days to your service representative.
NOTE Check the battery recharge date on the shipping carton label. If the date has expired
and the batteries were never recharged, do not use the UPS. Contact your service
representative.

Other manuals for Eaton 5125

Related product manuals