EasyManua.ls Logo

Eaton 9140 - Recycling the Used Battery or UPS

Eaton 9140
365 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
INSTALLATION
Eaton
®
9140 (9910-E82/E83) UPS Installation Guide for IBM
®
Applications S 164201715 Rev 2
www.eaton.com/ibm
20
6. Repeat Steps 3 through 5 for the other rail.
7. To tighten the rail adjustment, assemble four M4 machine screws
and four M4 locknuts to the middle of the rail assembly. Tighten
using a 7 mm (9/32) nut driver. See Figure 17.
Repeat for the other rail.
M4 Locknuts
M4 Screws
Figure 17. Tightening the Rail Adjustment (Right Rail Assembly Shown)

Table of Contents

Other manuals for Eaton 9140

Related product manuals