INSTALLATION
Eaton
®
9140 (9910-E82/E83) UPS Installation Guide for IBM
®
Applications S 164201715 Rev 2
www.eaton.com/ibm
22
10. If the front and rear mounting brackets are already installed, skip to
Step 13. If the brackets are not already installed, continue to
Step 11.
11. Align the four front mounting brackets with the screw holes on the
sides of the UPS and secure with 16 supplied M4 flat-head screws
(see Figure 19).
12. Align the two rear mounting brackets with the lowest two screw
holes on the sides of the UPS and secure with four supplied M4
flat-head screws.
Front Mounting
Brackets (4)
Rear Mounting
Brackets (2)
Figure 19. Installing the UPS Front and Rear Mounting Brackets