UPS Setup
Eaton 9355 UPS (20/30kVA) Installation and Operation Manual 164201626—Rev F www.eaton.com/powerquality 15
7. Replace the front door.
Note: Be sure to support the front and back of the cabinet when rolling it off the pallet to prevent tipping or
rolling away.
8. Raise the leveling feet so that they do not touch the pallet.
Figure 7. Raising the Leveling Feet
9. Slowly roll the cabinet toward the rear of the pallet. Once the pallet tilts, continue rolling the cabinet down
the pallet until the cabinet touches the floor (see Figure 8).
Figure 8. Unloading the Cabinet (UPS Shown)