Eaton 9395XC UPS 1200kW/1200kVA, 1350kW/1350kVA or 1500kW/1500kVA 164001079—Rev 01 53
Figure 24. I/O to ISBM/PM Section Joining
Section Connecting
Bolts (4)
I/O SECTION
ISBM/PM SECTION
Joining
Strap
See Figure: I_O to ISBM_PM
section Joining Strap for detail
Bolts (5)
{
NOTE Four M12 and five M5 bolts are provided in the hardware kit for connecting the I/O and
ISBM/PM sections at the bottom of the base (see Steps 2 and 3).
2. Locate the hardware kit (packed inside a drawstring bag tied to the I/O section). Locate the four M5
connecting bolts and secure the sections with the bolts from the hardware kit (see Figure 24).
3. Align the holes on the joining strap between the I/O and ISBM/PM sections. Secure the bracket with five
M5 bolts from the hardware kit (see Figure 25).