Eaton 9395XC UPS 1200kW/1200kVA, 1350kW/1350kVA or 1500kW/1500kVA 164001079—Rev 01 57
Figure 28. ISBM and ISBM/PM Section Conduit and Wire Entry Locations
ISBM/PM SECTIONI/O SECTION
ISBM/PM SECTION
Bottom View
Top View
I/O SECTION
Interface Entry Conduit Landings for TB1
through TB3 Wiring and Minislot Connections
Bottom Entry Conduit Landing for AC
Input and Output, and DC Input
(Remove panel to drill or punch
conduit holes.)
Top Entry Conduit Landing for AC
Input and Output, and DC Input
(Remove panel to drill or punch
conduit holes.)
3. Locate the external wiring terminal hardware kit packed on the bottom left side of the ISBM section.
4. Using hardware from the external wiring terminal hardware kit (see Table 9), connect phase A, B, and C
rectifier input power wiring from the utility source to the rectifier input terminals (E1, E2, E3) in the I/O
section (see Figure 30 and Figure 31. See paragraph 3.2.4 UPS System Power Wiring Preparation UPS
System Power Wiring Preparation for wiring and termination requirements.