EATON BiWire Flexi Installation Manual (PR215-216-520-03 15-03-16, PINSTFLEXIINST) March 2016 www.eaton.com 24
Installation Instructions
Fire Outputs & Battery Check
THIS TEST WILL ACTIVATE ANY EXTERNAL EQUIPMENT
CONNECTED TO THE FRE, FPE OR FIRERELAYS. IF THE
ACTIVATION OF THE EQUIPMENT ISNOT DESIRED THEN
THE EQUIPMENT MUST BE DISABLED, DISCONNECTED
OR POWERED OFF DURING THIS TEST AND RESTORED
ONCE THE TEST IS COMPLETE.
Measure the battery charger voltage, this should be around
27.6V.
Disconnect the mains supply and check the following:
• Power On (green) indicator is still on.
• General fault (amber) indication is on.
• Battery/Mains fault indication is on for mains fault.
The panel should not lose power during the following test.
Activate a call point in any zone.
Check the following on the panel:
• General fire indicator (red) is on.
• Correct zone fire indicator (red) is on.
• FRE On indicator (red) is on.
• FRE output has switched to 24V (if fitted).
• FPE output has switched to 24V (if fitted).
• Fire relay has switched over to C/NO.
• All fire alarm devices are sounding.
Check the following on the interlinked panel (if installed):
• General fire indicator (red) is on.
• FRE On indicator (red) is on.
• FRE output has switched to 24V (if fitted).
• FPE output has switched to 24V (if fitted).
• Fire relay has switched over to C/NO.
• All fire alarm devices are sounding.
Perform a soft reset and then check that the panel and
interlinked panel have returned to the normal condition
with mains fault.