13
INSTALLATION AND OPERATION MANUAL 25-16732-A November 2019 www.eaton.com
3.3 Panel Installation
NOTE
THE FOLLOWING INSTRUCTIONS MUST BE FOLLOWED
WITH MAINS AND BATTERY SUPPLIES DISCONNECTED
UNLESS OTHERWISE STATED.
NOTE
THE PANEL SHOULD BE INSTALLED IN A CLEAN, DRY,
REASONABLY WELL VENTILATED PLACE, AND NOT IN
DIRECT SUNLIGHT. TEMPERATURES IN EXCESS OF
40°C AND BELOW 5°C MAY CAUSE MALFUNCTIONS,
IF IN DOUBT CONSULT EATON ELECTRICAL SYSTEMS.
THE PANEL SHOULD BE LOCATED AWAY FROM ANY
POTENTIAL HAZARD, IN A POSITION WHERE IT IS
READILY ACCESSIBLE TO AUTHORISED STAFF, AND
THE FIRE SERVICES, IDEALLY ON THE PERIMETER OF A
BUILDING NEAR A PERMANENT ENTRANCE.
NOTE
IF YOU INTEND TO USE A REPEATER PANEL, PLEASE ENSURE THAT
THIS IS POWERED UP BEFORE THE MAIN FIRE PANEL.
Mounting the Panel
To prepare the panel for mounting, you need to remove the
front cover of the panel, and the PCB shelf and the PSE from
the back box.
•
To remove the front cover of the panel, unscrew the two
retaining screws located at the top corners of the panel,
see Figure 15.
•
It is recommended to remove the PCB shelf and the PSE
from the back box before drilling the holes.
•
To remove the PCB shelf push the clips down ①, then
push the shelf towards the top of the back box and then lift
forwards ②, see Figure 17.
•
To remove the PSE PCB from the back box unplug the
cables from the main board as shown in Figure 17, then
simply remove the screw and push the PCB up, to the right
and forwards as shown in Figure 18.
Figure 15. Remove Panel front cover
Figure 16. Remove the PSE Shelf
Figure 17. Disconnect the PSE
Figure 18. Remove the PSE