x Eaton BladeUPS 5 kVA to 60 kVA (N+1) User’s Guide 164201649—Rev 14
Figure 40. Example EBM Installations in Preassembled Parallel Systems ............................................................... 53
Figure 41. Example EBM Installation in a Large Parallel System............................................................................ 54
Figure 42. Recommended Rail Locations (Example Configuration) ........................................................................ 60
Figure 43. Wiring Entry Options..................................................................................................................... 61
Figure 44. Removing the Conduit Landing Plate ................................................................................................ 62
Figure 45. BladeUPS Bar Terminal Block ......................................................................................................... 62
Figure 46. Front Rail Screw Positions for the UPS ............................................................................................. 66
Figure 47. Installing the Rail Hardware (Right Rail Assembly Shown) ..................................................................... 66
Figure 48. Attaching the Front Rail ................................................................................................................. 67
Figure 49. Securing the Rear Rail (Right Rail Assembly Shown) ............................................................................ 67
Figure 50. Removing the Electronics Module ................................................................................................... 68
Figure 51. Installing the UPS Mounting Brackets............................................................................................... 69
Figure 52. Securing the Front of the UPS......................................................................................................... 69
Figure 53. Inserting the Rear Hold-Down Bracket .............................................................................................. 70
Figure 54. Installing the Communication Terminal Block Connectors ..................................................................... 70
Figure 55. Removing the UPS Battery Cover Plate............................................................................................. 71
Figure 56. Installing the UPS Battery Trays (Two Battery Strings).......................................................................... 71
Figure 57. Installing the UPS Single-string Battery Trays for 5.0 kVA BladeUPS ....................................................... 72
Figure 58. Installing the UPS Front Cover ........................................................................................................ 72
Figure 59. Example EBM Installations in Parallel Systems ................................................................................... 73
Figure 60. BladeUPS Module Rear Panel (Standalone UPS Shown with IEC 309-60A Output Power Cord)..................... 75
Figure 61. Removing the Input/Output Box Access Cover ................................................................................... 76
Figure 62. BladeUPS Hardwired Terminal Block ................................................................................................ 77
Figure 63. BladeUPS Module Rear Panel (Standalone UPS Shown with Hardwired Terminal Block).............................. 78
Figure 64. Powerware Hot Sync CAN Bridge Card............................................................................................. 79
Figure 65. Installing the Blue Terminating Plug (First UPS)................................................................................... 80
Figure 66. Installing the Blue Terminating Plug (Last UPS)................................................................................... 81
Figure 67. Typical CAN Bridge Card and Redundant Signal Wiring......................................................................... 82
Figure 68. Connecting UPSs to the BladeUPS Bar (Bottom Entry Shown) ............................................................... 84
Figure 69. Installing the Blue Terminating Plug (Single Parallel-Ready UPS Installation).............................................. 85
Figure 70. Connecting UPSs to the BladeUPS Bar (Bottom Entry Shown) ............................................................... 87
Figure 71. Removing the Jumper J7 (Side View) ............................................................................................... 89
Figure 72. BladeUPS Module Control Panel...................................................................................................... 95
Figure 73. BladeUPS Module Mimic Screen..................................................................................................... 95
Figure 74. Communication Options and Control Terminals (Standalone UPS shown)............................................... 109
Figure 75. Installing Communication Cables ................................................................................................... 110
Figure 76. Communication Port ................................................................................................................... 111
Figure 77. Optional X-Slot Cards .................................................................................................................. 112
Figure 78. External Control Terminal Connections ........................................................................................... 112
Figure 79. Normally-Open REPO Switch Wiring in a Standalone UPS................................................................... 115
Figure 80. Normally-Closed REPO Switch Wiring in a Standalone UPS................................................................. 115
List of Figures