EasyManua.ls Logo

Eaton BladeUPS - Page 37

Eaton BladeUPS
160 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Eaton BladeUPS 5 kVA to 60 kVA (N+1) User’s Guide 164201649—Rev 14 23
Figure 6. Removing the Ramp
Pallet Front
N O T E Leave this strap
installed until ready to
connect ramp.
Ramp
Wooden Mounting Guides
(2 pieces)
DO NOT REMOVE
Pallet Front
4. Lift the ramp from the back of the cabinet. Attach it to the pallet by inserting the left and right ramp pins
(tee nuts) into the pre-drilled holes at the rear of the pallet (see Figure 7).
5. Continue to section 3.7”Unloading the System”.
Installing the Ramp

Table of Contents

Other manuals for Eaton BladeUPS

Related product manuals