62 Eaton BladeUPS 5 kVA to 60 kVA (N+1) User’s Guide 164201649—Rev 14
NOTE For top wireway applications, see “top of cabinet” removal instructions in Top Entry
Installation.
2. Remove the six screws on the conduit landing plate and retain. Remove the plate and retain.
Figure 44. Removing the Conduit Landing Plate
Bottom Entry R ack Top Entry Rack
3. Use a Greenlee® punch to provide one or more holes in the conduit landing plate to accommodate the
input and output wiring for the system.
4. Replace the conduit landing plate.
5. Replace the top entry wireway access cover:
• Replace the cover in the recessed opening.
• Replace the four bolts that secure the cover.
Figure 45. BladeUPS Bar Terminal Block
Ground
Ground
Bottom Entry Terminal Block Top Entry T erminal Block
Installing the Input and Output Wiring