EasyManua.ls Logo

Eaton BladeUPS - Page 83

Eaton BladeUPS
160 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Eaton BladeUPS 5 kVA to 60 kVA (N+1) User’s Guide 164201649—Rev 14 69
Figure 51. Installing the UPS Mounting Brackets
6-32 Flat-Head
Screws
Mounting Bracket
12. Slide the UPS into the rack.
13. Parallel or parallel-ready system only. If you are installing other X-Slot cards besides the Powerware Hot
Sync CAN Bridge Card, skip to step 16.
NOTE Leaving the UPS unattached allows you to adjust the UPS position in the rack for any
clearance needed to install the X-Slot cards.
14. Using four M5 machine screws, secure the front of the cabinet to the rack as shown.
Figure 52. Securing the Front of the UPS
Position 9
Position 4
M5 Screws
15. Insert the two rear hold-down brackets on the rails into the slots on the rear of the cabinet.
a. If necessary, push out on the rack upright to allow the clearance needed to insert the bracket. The
rack upright flexes easily.
b. Verify that the brackets seat firmly, then tighten the nuts on the rear hold-down brackets. The UPS is
now secured in the rack.
Rack Setup for the UPS

Table of Contents

Other manuals for Eaton BladeUPS

Related product manuals