EasyManua.ls Logo

Eaton CEAG ZB-S Series - Contents

Eaton CEAG ZB-S Series
112 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
3
Contents
Mounting and Operating Instructions CEAG Central Battery System ZB-S 40071860179 (L) November 2018 www.ceag.de
4.4.13 Bus-Technology according to RS 485
or CG-S-Bus
............................55
4.4.14 Batteries for emergency power supply .......56
4.5 Label of ZB-S ...........................57
4.6 Example of Installation ....................58
5 TRANSPORT, PACKAGING AND STORAGE ..60
5.1 Safety Notes ...........................60
5.2 Transport inspection ......................60
5.3 Packaging ..............................60
5.4 Storage ................................60
6 INSTALLATION ........................61
6.1 Safety Notes ...........................61
6.2 Assembly ..............................61
6.3 Installation .............................62
6.4 Connection to mains .....................62
6.4.1 Connection to mains supply
of a ZB-S station
........................62
6.4.1.1 Usage of RCDs in the incoming mains
of ZB-S systems
........................63
6.4.2 Connection to mains of substations US-S .....63
6.5 Connection to battery power supply .........63
6.5.1 Connection to battery power supply
for a ZB-S station
........................64
6.5.2 Connecting the Battery supply
of a US-S substation
.....................64
6.6 Connection of temperature sensor ..........65
6.7 Connection and installation
of internal modules
......................65
6.8 Connection of emergency lighting ...........66
6.9 Connection and installation
of external modules
......................66
6.9.1 DLS/3Ph-Bus-Module .....................66
6.9.2 TLS-Bus-Module ........................67
6.9.3 CEAG 3-phase monitors with 24V current loop ..67
6.9.4 Completing Assembly ....................67
7 COMMISSIONING AND OTHER WORK .....68
7.1 Safety Notes ...........................68
7.2 Checking all connections ..................68
7.3 Voltage measurements ...................68
7.4 Insulation Testing ........................68
7.5 Checking / replacing of fuses ..............68
7.5.1 Checking the fuses of the mains
and/or battery power supply
...............69
7.5.2 Setting of float charge voltage of the Battery
Control Module (BCM) ....................69
7.5.3 Checking the fuses of SKU modules .........69
7.6 Checking and replacing internal modules .....70
7.7 Checking and replacing external modules .....70
7.8 Powering up the system ..................70
PART 2
8 OPERATING ...........................71
8.1 Safety Notes ...........................71
8.2 General information about operating .........71
8.3 Controls and displays on the modules ........71
8.3.1 Control module CU CG-S ..................72
8.3.2 DC/DC Converter ........................72
8.3.3 Batterie Control Modul (BCM) and charging
module CM 1,7 A, CM 3,4 A ...............72
8.3.4 SKU´s of the final circuits .................72
8.3.5 Data printer ............................72
8.4 Operating the CU CG-S control module ......73
8.4.1 Menu 1: “Test & Status Menu” .............76
8.4.2 Menu 2: “Block & reset alarms” ............78
8.4.3 Menu 3: “Basic settings” .................79
8.4.4 Menu 4: “DLS/TLS setup” .................86
8.4.5 Menu 5: “Circuit setup” ..................87
8.4.6 Menu 6 “Luminaire setup” ................90
8.4.7 Menu 7 “Logbooksetup” .................92
8.4.8 Menu 8 “Send ServicePinMsg” ............92
9 FAILURES .............................93
9.1 Interference immunity by screening .........93
9.1.1 Cable screens ..........................93
9.1.2 Screen connection .......................93
9.1.3 The fail-safe system ......................93
9.1.4 BCM failure codes .......................94
10 MAINTENANCE / CHECKING ............95
10.1 Safety Notes ...........................95
10.2 General information to maintenance / checking ..95
10.3 Enabling of end circuits with maintenance work . 96
10.4 ESF-E30 Activate fan for maintenance work ...96
APPENDIX A: OVERVIEW OF TERMINAL
ASSIGNMENTS
...................97
APPENDIX B: VDE REQUIREMENTS
FOR TELECOMMUNICATION CONTACTS
AND BUZZERS
....................99
APPENDIX C: LOCATION PLAN
FOR THE LUMINAIRES
............101
APPENDIX D: INSTALLATION EXAMPLE
MONITORING MODULES
..........102
APPENDIX E: CUSTOMER SERVICE ORDER .......103

Table of Contents

Related product manuals