49
4 Construction and Function
Mounting and Operating Instructions CEAG Central Battery System ZB-S 40071860179 (L) November 2018 www.ceag.de
4.4.8 Relay module CG IV and CG V
The desired function can be activated with an impulse of min. 20ms/24V.
If a FT or BT should be made once again the Function-Duration test must be reset by an impulse.
Function of command contacts
+24/0V FT ON +24/0V FT Off +24V/0V BT ON +24/0V BT OFF
Function test ON
Function test OFF
Battery duration test ON
Battery duration test OFF
Function of relay contacts
11/12 21/22 31/32 41/42 51/52
Deep-discharge protection ON ------ ------ ------ ------
Emergency lighting failure ------ ON ------ ------ ------
Charging fault ------ ------ ON ------ ------
Battery operation ------ ------ ------ ON ------
Mains operation ------ ------ ------ ------ ON
Switching capacity of contacts: 24V/0,5A AC/DC
Function of relay contacts
11/12 21/22 31/32 41/42 51/52
No operation ON ------ ------ ------ ------
Failure prior. 1 ------ ON ------ ------ ------
Failure prior. 2 ------ ------ ON ------ ------
Failure prior. 3 ------ ------ ------ ON ------
Emergency mode ------ ------ ------ ------ ON
Switching capacity of contacts: 24V/0,5A AC/DC
CG IV
CG V
These subassemblies allow the connection of the central battery system to a central control station (ZLT) or building
management system (BMS). The most important system states are transmitted via potential-free signalling contacts.
There are two input channels for the remote monitoring of the central battery system. A functional test can be initiated
via the input channel „FT“ and a continuous operation test (battery test) can be initiated via the input channel „BT“. Eight
LEDs indicate the state of the system.