EasyManua.ls Logo

Eaton Cutler-Hammer Digitrip RMS 510 - Lnformation Available; Trip

Eaton Cutler-Hammer Digitrip RMS 510
79 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
AD
33-855-4
Page
49
9.3
lnformation Available
in the Event of
a Trip
ln the event of
a Trip, the Digitrip
RMS Trip Unit
provides
information as summarized
in Table
9-2
for operator use.
Table 9-2
Data available local
to,
or
remote from,
the
Digitrip RMS Trip Unit during
operation.
RMS
510
RMS
610
RMS
810 & 910
Red LEDS light to
provide
Trip lndication of:
Long Delay Trip;
Short Delay Trjp;
lnstantaneous
Trip;
Ground Fault Trip;
Discriminator/Override
Trip
(LS
and
LSG only).
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
Alphanumeric
Digital Display Shows:
LDT
(Coded
message
for Long Delay
Trip);
SDT
(Coded
message for Short
Delay Trip);
INST
(Coded
message
for lnstantaneous Trip);
GNDT
(Coded
message
for Ground Fault
Trip);
DISC
(Coded
message for Discriminator
Trip);
EXTT
(Coded
message
for External Trip via PowerNet);
Phase
Currents
at trip
(reading
in amps x
1000);
Ground
Cunent at
trip
(reading
in amps
x 1000);
Peak Demand
(Mega
Watts) at trip;
Present Demand
(Mega
Watts);
Energy
(Mega
Watts
Hours) at trip;
Depress STEP
push-button
to delete coded
message
;
and
view
stored
data as selected.
X
X
X
X
X
X
X
X
ATR contacts
close for remote
indication of:
Long Delay
Trip;
Short
Delay Trip;
Long
Delay Trip.
X
X
X
X
X
X
Communications data
available
lor remote use as master
PC:
Device Address
(set
at
Trip Unit);
Breaker Status
Clrip).
X
X
Reason
for
Status:
LDT
(Coded
message
for Long Delay
Trip);
SDT
(Coded
message
for
Short
Delay Trip);
INST
(Coded
message
for lnstantaneous
Trip);
GNDT
(Coded
message
for Ground Fault
Trip);
DISC
(Coded
message for Discriminator
Trip);
EXTT
(Coded
message
for External Trip via
PowerNet);
Phase Currents at trip
(reading
in amps
x 1000);
Ground Current at
trip
(reading
in amps
x 1000);
Peak Demand
(Mega
Watts) at
trip;
Present
Demand
(Mega
Watts
Hours);
Energy
(Mega
Watts Hours) at trip.
ElT.t
Etfective 9/01

Table of Contents

Related product manuals