91
EA(B)O-6X06 01/2018 Rev. 1 3. Disassembly and Assembly
6281
6286
6284
6288
47. Heat the 5th and 6th speed synchronizer hub to 140°C
and, with the special tool EEA-17029 and a hammer,
mount the hub in its position in the shaft. During
installation of the hub, align and t the slots on the hub
to the ridges on the synchronizer ring.
48. With the special tool EEA-17026 and a hammer, install
the front bearing cone.
NOTE: If needed, heat the bearing to 120°C to
facilitate the installation.
49. Install the “pocket” bearing snap ring.
50. Install the three keys and the 5th and 6th speed
synchronizer sleeve on the synchronizer hub.
NOTE: Align the detent grooves for the keys on the
sleeve to the key slots on the hub.
Mainshaft